广州美博舞台灯光设备厂 11年
梁小姐 联系客服 | |
057985371176 13868967792 | |
13868967792 | |
义乌国际生产资料市场3楼30331 |
商铺公告
商品分类
商品推荐
CO2jet machine
Ned:
The equipment working on power is prohibition.
It must be wiring the electricity safely standard.
Please install specialized line in the ground for the machine.
It must be operating the gad steel bottle user standard.
The nozzle mustn’t facing the human and animal.
Confirmation the system connection yet, then connect electrifies and gas. ter of maintain.
2. Following damages situation is not in the free service range:
(1). Incorrect transports, installs, uses and arrange.
(2).Privately dismantle the product.
(3).External reason of abnormal voltage, fire etc.
(4).Other unavoidable reason such as thunder stroke,
Products features and technical parameter;
(1).Spray large amount of smoke, and the spray distance of up to 5-8m,
(2).It has a high compatibility, easy to operation.
(3).Voltage:AC220V(10%),one-way for power.
(4).Pressure:15MPa.
Structure illustration
二.System connection
Please check the packing case is complete or not before open it. Notice the shipping company in time when finding the packing case is damages in transit. And keep the damaged case as evidence, so that to make claim with the shipping company.
Products packing list:
1.A Large CO2 gas column
2.A control cable
3.A high pressure tube(6 meters)
4.A Instruction
Installs illustration:
220V-50Hz
|
||||
BOTTLE LF CO2
|
|
1. Places the large CO2 column on the corresponding position
2. Connects the gas meatus and the gas bottle
3. Turn on the valve of the gas bottle
4. Put down the bottle and keep it flat
5. The wire attached to the High-Pressure Pie. one end of which fastens firmly on the machine body, another fastens firmly on the bottleneck.
6. Connect the machine and the console.
7. Before disassembling, firstly turn off the bottle valve, let out the gas which remain in the pipe, then turn off the power, lastly separate the connector of the gas bottle.
Attention:
1. The bottle must put down and keep flat. or else the gas column cann’t up.
2. The trachea connection must be sure link.
3. When not use the machine, the nozzle, the steel bottle intake must be envelop, in order to prevent enter other thing.
三.Use manual
Operation method
Wire-control: Connect the power, and press the power control switch, the CO2gas column up at once.
DMX512 signal control: Press to the “DMX” switch, there has two channels under the DMX512 signal environment. After connect the DMX512 console, push the first switch will continuance 1 second CO2 column; push the first and secondly switch together , will continuance 3 seconds C02 column.
Attention:
The CO2 column squirt time cannot surpass for 3 seconds.
Two jet time intervals cannot be short in 5 seconds.
Before connect the power, please be sure each part of the CO2 column is connection already to operation
四.malfunction obviate
Simple malfunction obviate:
1. Press down the switch of power console, cann’t spray CO2 column, Please check connect power or no; the gas bottle have enough barometric or on.
2. Press down the switch of power console, the CO2 column effect not well. Please check if put down the bottle: or the operation environment is too desiccation.
3. If leak a few CO2 from nozzle when operation, please turn off the valve of the gas bottle, and repeat and close the machine, can ravel out the trouble.
五.Special statement:
The high pressure tube, nozzle and steel wire are damageable, not in the range of maintenance.
更新时间:2022-09-23 15:34
——— 温馨提示 ———
购买商品请先切换为买家状态
或登录义乌购APP扫二维码购买